IAS AC472
Printer Friendly Page
Feeling overwhelmed by IAS AC472 Accreditation?
Adjutant Software can ease and simplify the process. Most of the required criteria for AC472 Accreditation are currently built into Adjutant through our various Business Automation Solutions.
Here is how Adjutant Software can help with IAS AC472 Accreditation. Mouse over below to see how Adjutant Software complies with each of the IAS AC472 regulations.
IAS AC472 General Requirements Quality Assurance/Control System Fully Documented Quality System Documented system submitted to IAS Follow-up Inspections Two per year, unannounced Assessment by IAS Accredidation Subsections Fabrication of structural weldments Fabrication of cold-formed products not requiring welding Design of metal building systems Personnel Quality Manager Maintains the documented quality system Monitors the effective implementation of the documented quality system Assures that periodic internal audits are conducted and documented Assures that annual management reviews are conducted and documented In-House Quality Control Inspector Certified Welding Inspector (CWI) Familiar with codes and specs in contract docs Responsible for assuring that only qualified and certified welders are used Responsible for keeping up with welders' certifications Responsible for overall workmanship Responsible for properly identifying and inspecting incoming raw materials Responsible for ensuring the final assembly can be traced back to: incoming raw material quality assurance records the individual welder Responsible for reviewing all WPSs and PQRs Welding Personnel Qualified to ANSI/AWS Must have identifying number, letter, or symbol Engineer Control of Required Procedures Purchasing Type and Grade listed on PO Evaluation of Subcons and vendors Material Traceability Inspection and Testing Receiving inspection of incoming material Required specification/grade Mill Test Reports Certificates of conformance In-process inspection for workmanship Final weld testing Control of Inspection, Measuring, Test Equipment Control of Nonconforming Workmanship Procedure for Corrective Action Internal Audits Control of Quality Records Completed in-house quality inspection reports, forms, and checklists Mfg test reports and certs of compliance from vendors Copies of inspection reports by the inspection agency Records of internal audits Training records Evaluations of vendors and subcontractors Training of personnel Contract Review Engineering Information on how incoming contract docs are to be eval'd and provided to the engineer Information for the prep and checking of design calculations and erection drawings Procedure for the creation of a Letter of Certification Information on how detail drawings are prepared and how revisions are handled Required Data Name, Address, IAS Contact, Ph# Floor Plan of Facility List of Major Production Equipment List of typical items fabricated Copy of all Welding Procedure Specs (WPS) Copy of all Procedure Qualification Records (PQR) for WPSs qualified by testing List of qualified welding personnel, their approved welding process, and ID marks Evidence that welding personnel are qualified by 3rd party Name and cert number of the CWI/CWB/ICC acting as the IHQCI Name of deputy IHQCI Org Chart of responsible quality managers CEO Engineer in Responsible Charge General Manager Quality Manager IHQCI Deputy IHQCI Production Manager Welding Personnel List of approved vendors Any testing agencies employed to verify a WPS Subcontractors for fabrication must be IAS-accredited List of test and measuring equipment List of all engineers performing production w/ experience in years